Sensors and Systems
Breaking News
FTIR-based GHG analysis supporting soil and ecosystem research – Gasmet at EGU26
Rating12345Gasmet brings portable FTIR-based GHG analysis to EGU26 with...
Flir Introduces New Extech and Flir Test & Measurement Tools for Faster Inspections and Safer Diagnostics
Rating12345Flir, a Teledyne Technologies brand, a global leader in...
Flir and RocketPlan Streamline Restoration Workflows with Advanced Thermal Imaging Integration
Rating12345Flir announced an enhanced integration between its professional-grade iXX-Series...

July 15th, 2011
New Airport Northeast of Toronto – Not Required Until 2027

  • Rating12345

Transport Canada published this week a study that determined one additional airport will be needed in central Ontario between 2027 and 2037 and that the federal government should keep land it has owned northeast of Toronto since 1972. Although no specific construction plans have been released, the Pickering Lands Needs Assessment Study, published Monday by the federal government, stated Ottawa will “prepare a federal plan for the Pickering Lands in the coming months.” Read More