Sensors and Systems
Breaking News
FTIR-based GHG analysis supporting soil and ecosystem research – Gasmet at EGU26
Rating12345Gasmet brings portable FTIR-based GHG analysis to EGU26 with...
Flir Introduces New Extech and Flir Test & Measurement Tools for Faster Inspections and Safer Diagnostics
Rating12345Flir, a Teledyne Technologies brand, a global leader in...
Flir and RocketPlan Streamline Restoration Workflows with Advanced Thermal Imaging Integration
Rating12345Flir announced an enhanced integration between its professional-grade iXX-Series...

June 25th, 2011
Electric Power Station Launched in Bulgarian Beach Resort

  • Rating12345

Bulgaria’s Prime Minister, Boyko Borisov and Economy and Energy Minister,Traicho Traikov, are opening Saturday the first stage of the building of a newelectric power substation on the Black Sea coast. The “Helios” substation is being built at the largest Bulgarian summer resort at Sunny Beach. The new facility is owned by the National Electric Company, NEK, and its CEO, Mihail Andonov, will also take part in the ceremony. Read More