Sensors and Systems
Breaking News
Flir to Reveal Advanced Decarbonization and Asset Protection Solutions at Energy Exchange Australia 2026
Rating12345As Australia’s energy sector faces intensifying pressure to slash...
Terran Orbital Subsidiary Selected for ESA Planetary Defense Mission to Asteroid Apophis
Rating12345IRVINE, Calif., March 13, 2026 — Terran Orbital, a global...
Securing the Future with Geospatial: SLU, NGA Host Geo-Resolution Conference on September 10
Rating12345ST. LOUIS – The National Geospatial-Intelligence Agency and Saint Louis...

October 7th, 2011
US Air Traffic Control System At Risk

  • Rating12345

Two key government watchdogs warned Wednesday that a $40 billion project to revolutionize air travel still is at risk of costly delays, even as its congressional champions worried that funding cuts might set it back further. Sitting side by side at a House subcommittee hearing, the inspector general for theTransportation Department and a director at the Government Accountability Office said that initial management mistakes could haunt the program even as the Federal Aviation Administration mounts an aggressive effort to accelerate implementation. Read More