Sensors and Systems
Breaking News
GIS Certification Institute Welcomes InterDev as a New GISCI Endorsing Employer
Rating12345Des Plaines, IL — The GIS Certification Institute (GISCI)...
Kongsberg Discovery and MacArtney partner for turnkey ROTV surveying and inspection capability
Rating12345Kongsberg Discovery and MacArtney Underwater Technology have signed a...
Looq AI Expands Global Partner Ecosystem to Advance Ground-Based Reality Capture in Surveying, Engineering, and Utilities
Rating12345Partnerships Across North America, Europe, and Asia Extend Survey-Grade...

May 5th, 2011
UAE Power Cuts of Up to Eight Hours In Capital

  • Rating12345

Residents can expect regular electricity cuts starting this month as officials work to switch the capital to a more efficient power system. All of the power substations on Abu Dhabi island will be converted to an automatic system that will allow the Abu Dhabi Distribution Company (ADDC) to repair problems remotely. These updates to the system will be carried out during routine maintenance that will leave residents without power for up to eight hours at a time. Residents affected by the scheduled cuts will be informed days before the event, according to Robert Emerson, an adviser with ADDC. Read More