Sensors and Systems
Breaking News
Teledyne Geospatial and Pointerra3D deliver real-time insights for grid resiliency and rapid response to support the utility industry
Rating12345Vaughan, Ontario, CANADA – January 21, 2025 — Teledyne...
NSG and Esri Global Join Forces to Advance Geospatial Innovation at Esri Saudi User Conference 2025
Rating12345Neo Space Group (NSG), a PIF company and Saudi...
EagleView Launches New Property Data Ecosystem
Rating12345Now customers across property finance, real estate, insurance, roofing,...

October 21st, 2007
Modelling Proves No Mission is Impossible

  • Rating12345

Complex modelling work completed by CSIRO has helped identify and solve flow distribution problems at BP’s Bulwer Island refinery, saving the company millions of dollars in operating costs. In what could be a world first, researchers used computational fluid dynamics (CFD) to develop a complete, three-dimensional reactive model of a fluidised bed catalytic cracker regenerator to help identify effective modifications for improving unit performance. CSIRO Minerals research program leader Dr Phil Schwarz and BP Bulwer Island Refinery process support superintendent John Lee worked closely on the project. The duo received the 2006 Engineers Australia John A. Brodie Medal – awarded for contributions to chemical engineering – for their paper on the work.

Although BP staff believed they understood the problem and how to fix it, the potential cost of getting it wrong led to them calling in Dr Schwarz.

Dr Schwarz used CFD to examine potential modifications for solving temperature differences and combustion problems which were affecting energy efficiency within the regenerator.

Read More

Leave a Reply

Your email address will not be published. Required fields are marked *