Sensors and Systems
Breaking News
FTIR-based GHG analysis supporting soil and ecosystem research – Gasmet at EGU26
Rating12345Gasmet brings portable FTIR-based GHG analysis to EGU26 with...
Flir Introduces New Extech and Flir Test & Measurement Tools for Faster Inspections and Safer Diagnostics
Rating12345Flir, a Teledyne Technologies brand, a global leader in...
Flir and RocketPlan Streamline Restoration Workflows with Advanced Thermal Imaging Integration
Rating12345Flir announced an enhanced integration between its professional-grade iXX-Series...

November 10th, 2010
New Montreal $3B Turcot To Be Built by 2018

  • Rating12345

MONTREAL GAZETTE – The Quebec government unveiled its long-awaited new plan for the Turcot Interchange on Tuesday morning. The new plan is to cost $3 billion, double the price tag of Transport Quebec’s original project, unveiled in 2007. Read More