Sensors and Systems
Breaking News
GIS Certification Institute Welcomes InterDev as a New GISCI Endorsing Employer
Rating12345Des Plaines, IL — The GIS Certification Institute (GISCI)...
Kongsberg Discovery and MacArtney partner for turnkey ROTV surveying and inspection capability
Rating12345Kongsberg Discovery and MacArtney Underwater Technology have signed a...
Looq AI Expands Global Partner Ecosystem to Advance Ground-Based Reality Capture in Surveying, Engineering, and Utilities
Rating12345Partnerships Across North America, Europe, and Asia Extend Survey-Grade...
  • Aug 1, 2010
  • Comments Off on Bulgaria’s PM to Open Construction of Lot 3 of Trakiya Highway
  • Headlines
  • 302 Views

August 1st, 2010
Bulgaria’s PM to Open Construction of Lot 3 of Trakiya Highway

  • Rating12345

NOVINTE BULGARIA – Bulgaria’s PM Boyko Borisov and the Minister for Regional Development, Rosen Plevneliev, will make the first groundbreaking of Lot 3 of the Trakiya Highway on Monday. The whole length of Lot 3, connecting the Bulgarian town of Nova Zagora and the city of Yambol, is 34,3 km. It will include two lanes in each direction. Read More