Sensors and Systems
Breaking News
FTIR-based GHG analysis supporting soil and ecosystem research – Gasmet at EGU26
Rating12345Gasmet brings portable FTIR-based GHG analysis to EGU26 with...
Flir Introduces New Extech and Flir Test & Measurement Tools for Faster Inspections and Safer Diagnostics
Rating12345Flir, a Teledyne Technologies brand, a global leader in...
Flir and RocketPlan Streamline Restoration Workflows with Advanced Thermal Imaging Integration
Rating12345Flir announced an enhanced integration between its professional-grade iXX-Series...

May 20th, 2011
Brazil Water Project on Schedule

  • Rating12345

The ground may still be wet from consistent rainfall the past few weeks, but the Brazil Water System Improvements Project is still moving forward on schedule. Hannum, Wagle and Cline Project Engineer Matthew Pierce spoke to The Brazil Times recently, shortly after a monthly progress meeting with contractors about what has been done in the past month. “The new well is just about complete,” Pierce said. “The radio communications tower has been erected and its antenna installed, the fiberoptics should be pulled through this week and there are some other small odds and ends that need to be finished. All we are waiting on right now is the delivery of the Supervisory Control and Data Acquisition (SCADA) components.” Read More