Sensors and Systems
Breaking News
FTIR-based GHG analysis supporting soil and ecosystem research – Gasmet at EGU26
Rating12345Gasmet brings portable FTIR-based GHG analysis to EGU26 with...
Flir Introduces New Extech and Flir Test & Measurement Tools for Faster Inspections and Safer Diagnostics
Rating12345Flir, a Teledyne Technologies brand, a global leader in...
Flir and RocketPlan Streamline Restoration Workflows with Advanced Thermal Imaging Integration
Rating12345Flir announced an enhanced integration between its professional-grade iXX-Series...

July 12th, 2011
Masdar Windfarm Groundwork Finished in UK

  • Rating12345

Masdar, Abu Dhabi’s clean energy company, has completed groundwork for what is to be the world’s biggest offshore wind farm – in London’s Thames Estuary – as it refocuses its strategy at home to include energy drawn from the skies. The company, which is building the 1 gigawatt array with partners Denmark’s Dong Energy and Germany’s E.ON, has built 22 of the 177 foundations planned for the Thames turbines and is on track to meet a target of installing 630 megawatts of power by the end of next year, Masdar said yesterday. Read More