Sensors and Systems
Breaking News
FTIR-based GHG analysis supporting soil and ecosystem research – Gasmet at EGU26
Rating12345Gasmet brings portable FTIR-based GHG analysis to EGU26 with...
Flir Introduces New Extech and Flir Test & Measurement Tools for Faster Inspections and Safer Diagnostics
Rating12345Flir, a Teledyne Technologies brand, a global leader in...
Flir and RocketPlan Streamline Restoration Workflows with Advanced Thermal Imaging Integration
Rating12345Flir announced an enhanced integration between its professional-grade iXX-Series...

August 3rd, 2011
Ontario Liberals Entrench 1,800 Renewable Power Projects

  • Rating12345

Ontario’s Liberal government has entrenched the legal rights of 1,800 proposed renewable energy contracts – making it impossible for a new government to cancel them. The Liberals have changed the terms for approving contracts under its feed-in tariff program or FIT. Under the old system, the Ontario Power Authority, which signs the contracts with power developers, could unilaterally terminate proposed agreements at a relatively late stage of the approval process. Read More