Sensors and Systems
Breaking News
FTIR-based GHG analysis supporting soil and ecosystem research – Gasmet at EGU26
Rating12345Gasmet brings portable FTIR-based GHG analysis to EGU26 with...
Flir Introduces New Extech and Flir Test & Measurement Tools for Faster Inspections and Safer Diagnostics
Rating12345Flir, a Teledyne Technologies brand, a global leader in...
Flir and RocketPlan Streamline Restoration Workflows with Advanced Thermal Imaging Integration
Rating12345Flir announced an enhanced integration between its professional-grade iXX-Series...

March 2nd, 2011
Bui Project Needs Additional $168m Funding

  • Rating12345

The Government of Ghana is seeking an additional $168 million funding from the EXIM Bank of China to complete Ghana’s third hydroelectric power dam, the Bui Hydroelectric Dam in 2013. The Deputy Minister of Energy, Mr. Inusah Fuseini disclosed this to the Business Chronicle at the project site at Bui, in the Tain District of the Brong-Ahafo Region. Read More