Sensors and Systems
Breaking News
World Lidar Day Returns for its Second Annual Celebration on Feb. 12, 2025
Rating12345Global event to shine a spotlight on the transformative...
Trimble and GroundProbe Collaborate to Offer Complete Monitoring Portfolio for Geotechnical and Geospatial Mining Professionals
Rating12345Integrated approach means less hassle and more support for...
Space42 and ICEYE Announce Joint Venture to Bring Satellite Manufacturing to the UAE
Rating12345ABU DHABI, UAE —  Space42 (ADX: SPACE42), a UAE-based...

October 2nd, 2011
Climate Fix Tech Test Put On Hold

  • Rating12345

A pioneering test of a climate “tech fix” planned for October faces a six-month delay as scientists discuss the issues it raises with their critics. The test is part of the UK-based Stratospheric Particle Injection for Climate Engineering (Spice) project. It would use a balloon and a kilometre-long hose to spray water into the upper atmosphere – a prelude to spraying climate-cooling sulphate particles. Read More

Leave a Reply

Your email address will not be published. Required fields are marked *