Sensors and Systems
Breaking News
​​​GEO Business 2026 breaks attendance records with 6,200+ professionals
Rating12345Over 6,200 professionals headed to GEO Business 2026, cementing its position...
Trimble Opens Entries for the 2026 Construction Innovation Awards
Rating12345Award program recognizes organizations leveraging technology to drive innovation,...
Air Pollution’s Daily Pulse Over the Northeast 
Rating12345New observations from NASA’s TEMPO mission are providing an...

November 6th, 2010
AltaLink Transmission Line Energized – Doubles Wind Power in Alberta

  • Rating12345

Alberta has access to twice as much wind power now that a 90-kilometre transmission line is up and running between Pincher Creek and Lethbridge. AltaLink CEO Scott Thon says the 240-kilovolt line strengthens the existing electrical transmission system in the southwest part of the province. Read More