Sensors and Systems
Breaking News
Space Park Leicester to appear at US Commercial Space Week
Rating12345Space Park Leicester’s chief executive has been invited to...
Hexagon unites multiple AECO brands under Hexagon Multivista to simplify construction project workflows
Rating12345 Hexagon Multivista integrates multiple architecture, engineering, construction, and...
Satellite monitoring systems for real-time RF intelligence
Rating12345How high-speed digitization and edge processing from Teledyne SP...

October 5th, 2007
Netherlands Infrastructure Includes Many Bridges

  • Rating12345

RAILWAY TECHNOLOGY – Nederlandse Spoorwegen (Netherlands Railways – NS) runs trains over 2000km of electrified railway, and conversion of the overhead from 1500kV dc to 25kV ac is planned to massively improve the quality of service. The changes are needed due to acute, and worsening, capacity problems. Since the 1980s, the drive to increase the number of passenger trains has overloaded the power supply.
Read More