Sensors and Systems
Breaking News
FTIR-based GHG analysis supporting soil and ecosystem research – Gasmet at EGU26
Rating12345Gasmet brings portable FTIR-based GHG analysis to EGU26 with...
Flir Introduces New Extech and Flir Test & Measurement Tools for Faster Inspections and Safer Diagnostics
Rating12345Flir, a Teledyne Technologies brand, a global leader in...
Flir and RocketPlan Streamline Restoration Workflows with Advanced Thermal Imaging Integration
Rating12345Flir announced an enhanced integration between its professional-grade iXX-Series...

October 27th, 2011
Reve Erects Gamesa Wind Energy 4.5-MW STI First Wind Turbines

  • Rating12345

The independent certification body, GL Renewables Certification (GL), have Approved the machine, making it “finance” and bolstering STI sales potential. The device features six Technological innovations, while global STI testing plan, Unprecedented in the industry, Involved component 618 trials at 100 Accredited laboratories and testing centers (300,000 engineering hours validation). The turbine stands out in the construction industry for lightweight STI STI despite size : a 120-Metro Tower and 62.5-meter blades, The Competitiveness of STI cost of energy, ease of transport and assembly, thanks to a segmented blade – unique in the world – and coupled to the crane and nacelle assembly and servicing Used for ( FlexiFit). The turbine is in reality: Have Been series produced devices for months, With full rollout slated to begin manufacturing in 2012, as Gamesa Already have landed deals to install the machines in Europe. Gamesa, a global leader in wind energy technology, IEC WT 01 has obtained type certification from GL Renewables Certification (GL) for STI Gamesa G128-4.5 MW wind turbine, the independent certification body After the technology Endorsed Used in the Most Powerful device on the onshore wind power market.  Read More