Sensors and Systems
Breaking News
Flir to Reveal Advanced Decarbonization and Asset Protection Solutions at Energy Exchange Australia 2026
Rating12345As Australia’s energy sector faces intensifying pressure to slash...
Terran Orbital Subsidiary Selected for ESA Planetary Defense Mission to Asteroid Apophis
Rating12345IRVINE, Calif., March 13, 2026 — Terran Orbital, a global...
Securing the Future with Geospatial: SLU, NGA Host Geo-Resolution Conference on September 10
Rating12345ST. LOUIS – The National Geospatial-Intelligence Agency and Saint Louis...

January 4th, 2012
Calls for Better Preparation for Storms by Electric Utilities

  • Rating12345

Director Veli-Pekka Nurmi of the Accident Investigation Board is calling on electric utilities to be better prepared for major problems in electricity distribution. “The Accident Investigation Board emphasised the preparation of electric utilities after the storms of the summer of 2010”, Nurmi points out. “The companies should consider if their capacity – electricians, supervisors, tree cutters, and machinery – has been gauged correctly in relation to the size of their own network. The people who have been at work have undoubtedly done all that is humanly possible.” Read More