NORWAY POST – The contract is for Front End Engineering and Design (FEED) and site preparation, with the option at ExxonMobil’s discretion to subsequently provide detailed engineering, procurement and construction (EPC) services. The contract value for Aker Solutions’ share of the FEED and site preparation is USD 70 million. The Hebron Field is an oil and gas development in the Atlantic Ocean located 350 kilometres offshore from St. John’s, in Newfoundland and Labrador, Canada. Read More