Sensors and Systems
Breaking News
Flir to Reveal Advanced Decarbonization and Asset Protection Solutions at Energy Exchange Australia 2026
Rating12345As Australia’s energy sector faces intensifying pressure to slash...
Terran Orbital Subsidiary Selected for ESA Planetary Defense Mission to Asteroid Apophis
Rating12345IRVINE, Calif., March 13, 2026 — Terran Orbital, a global...
Securing the Future with Geospatial: SLU, NGA Host Geo-Resolution Conference on September 10
Rating12345ST. LOUIS – The National Geospatial-Intelligence Agency and Saint Louis...

September 9th, 2010
Russia Completed Upgrade of Road to Norwegian Border

  • Rating12345

BARENTS OBSERVER – Road authorities in Murmansk have completed the upgrade of the 240 km long highway leading to the Norwegian border. In two months also the road leading to the Finnish border will be completed. The highway, which stretches from Murmansk City to the border station of Borisgleb has now been upgraded to Euro-standard, Vesti.ru reports. The road is part of the M-18 highway, the main road transport route stretching all through Murmansk Oblast. Read More