Sensors and Systems
Breaking News
Flir to Reveal Advanced Decarbonization and Asset Protection Solutions at Energy Exchange Australia 2026
Rating12345As Australia’s energy sector faces intensifying pressure to slash...
Terran Orbital Subsidiary Selected for ESA Planetary Defense Mission to Asteroid Apophis
Rating12345IRVINE, Calif., March 13, 2026 — Terran Orbital, a global...
Securing the Future with Geospatial: SLU, NGA Host Geo-Resolution Conference on September 10
Rating12345ST. LOUIS – The National Geospatial-Intelligence Agency and Saint Louis...

June 6th, 2010
874 Auditoriums for Girls, Boys Under Construction

  • Rating12345

SAUDI GAZETTE – The Ministry of Education is building 874 multi-purpose auditoriums for girls and boys all over the Kingdom for extracurricular activities at a cost of SR6.4 billon, said Fahd Al-Hamad, Supervisor General of the Building Agency at the Ministry of Education here.He said the projects being carried out by a Chinese consortium will be completed in 14 months. Read More