Sensors and Systems
-->
Breaking News
Q-CTRL overcomes GPS-denial with quantum sensing, achieves quantum advantage
Rating12345World-first demonstrations validate the company’s quantum navigation technologies work...
FAA and ASSURE Announce UAS Detection Testing at Cape May Ferry Terminal
Rating12345STARKVILLE, Miss. – The FAA and ASSURE, announced that...
PIX4Dcatch is an integral component of Topcon’s newest handheld scanning solution, the CR-H1, designed for accurate reality capture
Rating12345Lausanne, April 15, 2025 Pix4D is a core technology...

October 27th, 2011
Reve Erects Gamesa Wind Energy 4.5-MW STI First Wind Turbines

  • Rating12345

The independent certification body, GL Renewables Certification (GL), have Approved the machine, making it “finance” and bolstering STI sales potential. The device features six Technological innovations, while global STI testing plan, Unprecedented in the industry, Involved component 618 trials at 100 Accredited laboratories and testing centers (300,000 engineering hours validation). The turbine stands out in the construction industry for lightweight STI STI despite size : a 120-Metro Tower and 62.5-meter blades, The Competitiveness of STI cost of energy, ease of transport and assembly, thanks to a segmented blade – unique in the world – and coupled to the crane and nacelle assembly and servicing Used for ( FlexiFit). The turbine is in reality: Have Been series produced devices for months, With full rollout slated to begin manufacturing in 2012, as Gamesa Already have landed deals to install the machines in Europe. Gamesa, a global leader in wind energy technology, IEC WT 01 has obtained type certification from GL Renewables Certification (GL) for STI Gamesa G128-4.5 MW wind turbine, the independent certification body After the technology Endorsed Used in the Most Powerful device on the onshore wind power market.  Read More