Sensors and Systems
Breaking News
Commercial UAV Expo 2024 Convenes Thousands for Historic 10th Edition
Rating12345Commercial drone event hosted 3,321 UAS professionals; record-breaking exhibit...
Trimble Unveils Transporeon Visibility with Seamless TMS Integration
Rating12345WESTMINSTER, Colo. — Trimble (NASDAQ: TRMB) announced the launch of...
DATAMARK Technologies Earns Frost & Sullivan 2024 Product Innovator Award For Indoor Mapping Excellence
Rating12345PITTSBURGH —   DATAMARK Technologies, a leader in interoperable solutions...

June 14th, 2010
Bureau of Reclamation Takes a Laser Look at Hoover Dam’s Monument Plaza

  • Rating12345

In a first of its kind effort, the Bureau of Reclamation’s Engineering Services Office in Boulder City, NV, built a detailed, highly accurate, as-built model of Hoover Dam’s 75-year-old Monument Plaza using high-definition surveying technology from Leica Geosystems. The  terrazzo floor is cracking and showing weather damage as are some of the bronze features on the Plaza, likely due to weather, pedestrian traffic and age. To determine repair or rehabilitation options, Reclamation needed as-built data of the Plaza to within a fraction of an inch. Read More

Leave a Reply

Your email address will not be published. Required fields are marked *