Sensors and Systems
Breaking News
Geoprofessionals spend a quarter of their time managing data and are increasingly turning to AI, reveals new Seequent survey
Rating12345 Mining and civil geoprofessionals rate data management as highly/critically important but...
West Side Tractor Sales Co. Named Newest Trimble Technology Outlet, Serving Customers in Illinois, Indiana and Michigan
Rating12345West Side Tractor Sales to offer and support Trimble...
GISCI Celebrates 207 Newly Certified GIS Professionals
Rating12345Des Plaines, IL (January 27, 2026) – The GIS...

June 29th, 2011
Digital Terrain Model of the Republic of Serbia Published

  • Rating12345

“Digital Orthophoto Production in the Republic of Serbia” Project, within the CARDS program through European Union donation, had covered, apart from digital orthophoto, production of Digital Terrain Model, which was used for the purpose of images ortho-rectification within the orthophoto production.

The following types of DTM had been produced:

  • grid size 5 m, average height accuracy ± 40 cm for 166 urban areas (A= 3199 km²),

  • grid size 10 m, average height accuracy ± 80 cm for territories of cadastral municipalities with survey being performed in coordinate system other than national coordinate system (A= 6260 km²),

  • grid size 25 m, average height accuracy ±1.60 m for the entire territory of the Republic of Serbia, except: territory of Kosovo and Metohija, territory of DTM grid size 10 m production and territory of the City of Belgrade (A= 70600 km²).

    Read More